Sector: Wastewater
Sub-Sector / Technically Autonomous Unit (Network, basin, ..): National Level
  Component Present Situation Target Situation Projects Characteristics Priority
                Technical Constraints Cost Impact Uncertainty  
Sector Sub-sector Geographic area   Sp St ∆S   Description Min. delay to start Min. constr. period Million US$ Land value / expro (a') Yearly maintenance cost (b) Major rehab/replac. cost (c ) Span for rehab/replc (d) Yearly operation cost (e) Uncertainty   (High, Medium, Low)  
                  (Year) (Year)     % %   %        
      Physical Stock                                  
                                         
Waste water   National   The initial master plan for wastewater (sewage & stormwater) was prepared in 1982. The coverage and demands were updated in 1994. Since then major works were implemented or are in the process for implementaion.  The master plan updated to set the design guidelines and standards, including stormwater drainage, the general implementation schedule, the compilation of the wastewater works performed by various administrations, the national vision and targets Updating Wastewater (sewage & stormwater) Master Plan, including review of design options, setting design criteria, guidelines and standards, establishing implementation priorities and performance indicators, defining methods of operation and management and drafting cooperation procedures among the relevant administrations   Updating the Master Plan should involve at least one engineer from each concerned administration.  1 year to write the TOR 2 2           50% defining needs, setting priorities, developing administrative, technical and management know how. L 1
Waste Water   National     Adequate construction standards & workmanship established Setting and adopting standard specifications & construction details. Awareness workshops held by the administration for all stakeholders (Consultants, Contractors, Municipality, etc.)   Hiring the services of a consultancy firm with long track records to prepare the requirements, and establish the administrative set up to follow 1 1 0.5 0 0 0 0 0 25% Reduces O&M & replacement costs; Standardize construction & facilitate operation L 2
      Institutional Setup                              
        The 1982 master plan included an administrative set up for its implementation. It was not implemented due to the civil unrest. In the early 2000's new decrees were issued to regulated the water and wastewater sector. The decrees give the responsibility for planning and operation of the wastewater sector to the water establishments. The ministry of water and energy maintained the power of the sector regulation and coordination among the relevant administrative units. The operational procedures between the ministry, the water establishments, the municipalities who own the collection networks and the ministry of public works responsible for the O&M of certain categories of roads are yet to be defined. The ministry has established the department/section responsible for supporting the establishments, is monitoring the performance and assisting the establishments setting priorities of works, setting standards, securing funds, and setting performance indicators     Resolving governmental decision concerning staff hiring and salaries                        
      Economic values:                              
      Investment (a)                              
      Land value / expropriation (a')                              
      Yearly maintenance cost (b)                              
      Major rehab/replac. cost (c )                              
      Span for rehab/replc (d)                              
      Yearly operation cost (e)                                  
      Performance Indicators:                                  
                                         
      Results                                  
      Low % of polluted water resources                                  
      Volume of TSE available for irrigation & landscape irrigation                                  
      Means                                  
      Coverage of collection network                                  
      % of sewerage treated                                  
      Capabilities of Establishment                                  
      Number of employees per 1000 connections                                  
                                         
Priority 00
Priority 0
Priority 1