Sector:
Wastewater |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sub-Sector / Technically
Autonomous Unit (Network, basin, ..): National Level |
|
|
|
Component |
Present Situation |
Target Situation |
Projects |
Characteristics |
Priority |
| |
|
|
|
|
|
|
|
Technical Constraints |
Cost |
Impact |
Uncertainty |
|
| Sector |
Sub-sector |
Geographic area |
|
Sp |
St |
∆S |
|
Description |
Min. delay to
start |
Min. constr.
period |
Million US$ |
Land value /
expro (a') |
Yearly
maintenance cost (b) |
Major
rehab/replac. cost (c ) |
Span for
rehab/replc (d) |
Yearly operation
cost (e) |
Uncertainty |
|
(High, Medium,
Low) |
|
| |
|
|
|
|
|
|
|
|
(Year) |
(Year) |
|
|
% |
% |
|
% |
|
|
|
|
| |
|
|
Physical Stock |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Waste
water |
|
National |
|
The
initial master plan for wastewater (sewage & stormwater) was prepared in
1982. The coverage and demands were updated in 1994. Since then major works
were implemented or are in the process for implementaion. |
The master plan
updated to set the design guidelines and standards, including stormwater
drainage, the general implementation schedule, the compilation of the
wastewater works performed by various administrations, the national vision
and targets |
Updating
Wastewater (sewage & stormwater) Master Plan, including review of design
options, setting design criteria, guidelines and standards, establishing
implementation priorities and performance indicators, defining methods of
operation and management and drafting cooperation procedures among the
relevant administrations |
|
Updating
the Master Plan should involve at least one engineer from each concerned
administration. |
1 year to write
the TOR |
2 |
2 |
|
|
|
|
|
50% |
defining needs, setting
priorities, developing administrative, technical and management know how. |
L |
1 |
| Waste
Water |
|
National |
|
|
Adequate
construction standards & workmanship established |
Setting and
adopting standard specifications & construction details. Awareness
workshops held by the administration for all stakeholders (Consultants,
Contractors, Municipality, etc.) |
|
Hiring the services of a
consultancy firm with long track records to prepare the requirements, and
establish the administrative set up to follow |
1 |
1 |
0.5 |
0 |
0 |
0 |
0 |
0 |
25% |
Reduces O&M &
replacement costs; Standardize construction & facilitate operation |
L |
2 |
| |
|
|
Institutional
Setup |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
The 1982 master
plan included an administrative set up for its implementation. It was not
implemented due to the civil unrest. In the early 2000's new decrees were
issued to regulated the water and wastewater sector. The decrees give the
responsibility for planning and operation of the wastewater sector to the
water establishments. The ministry of water and energy maintained the power
of the sector regulation and coordination among the relevant administrative
units. The operational procedures between the ministry, the water
establishments, the municipalities who own the collection networks and the
ministry of public works responsible for the O&M of certain categories of
roads are yet to be defined. |
The ministry
has established the department/section responsible for supporting the
establishments, is monitoring the performance and assisting the
establishments setting priorities of works, setting standards, securing
funds, and setting performance indicators |
|
|
Resolving governmental decision
concerning staff hiring and salaries |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Economic
values: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Investment (a) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Land value /
expropriation (a') |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Yearly
maintenance cost (b) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Major
rehab/replac. cost (c ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Span for
rehab/replc (d) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Yearly
operation cost (e) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Performance Indicators: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Low % of
polluted water resources |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Volume of TSE
available for irrigation & landscape irrigation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Means |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Coverage of
collection network |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
% of sewerage
treated |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Capabilities of
Establishment |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Number of
employees per 1000 connections |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Priority 00 |
|
|
Priority 0 |
|
|
Priority 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|