Sector:
Water supply |
|
|
Present Population |
Population (2020) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sub-Sector / Technically
Autonomous Unit: Barouk |
|
353,000 |
410,000 |
|
|
|
|
|
|
|
|
Component |
Present Situation |
Target Situation |
Projects |
Characteristics |
Priority |
|
|
|
|
|
|
Technical Constraints |
Cost |
Impact |
Uncertainty |
|
| Sector |
Sub-sector |
Geographic area |
|
Sp |
St |
∆S |
Remarks |
Description |
Min.
delay to start (Year) |
Min.
constr. Period (Year) |
Million
US$ |
Land
value / expro. (a') % |
Yearly
maintenance cost (b) % |
Major
rehab/replac. cost (c ) % |
Span
for rehab./replc. (d) |
Yearly
operation cost (e) % |
Remarks |
Uncertainty |
|
| |
|
|
Physical Stock |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Number and
capacity of treatment plants |
0 |
1 Treatment plant |
Total capacity:
50,000 m3/day, the first phase: 25,000 m3/day. It represents a component of
Iklim ElKharoub project |
Included elsewhere |
|
|
|
|
|
|
|
|
|
Included elsewhere |
|
|
|
|
|
| Water |
|
Mount Leb. |
Number and
capacity of reservoirs(m3) |
Number: 89;
capacity: 71200 m3 |
82,000 m3 |
Rehabilitation of reservoirs
(39950 m3) |
|
This volume is
based on the Societé Générale diagnostic. The responsible authority should
conduct a more detailed diagnostic |
2 |
5 |
1.2 |
|
1 |
10 |
|
10 |
|
30% |
|
High |
1 |
|
| Water |
|
Mount Leb. |
Length of
network (Transmission+Distribution)(km) |
2174
km |
2198.6 km |
1536 km of
pipe for replacement |
|
This project
necessitates to conduct the diagnostic study of water supply systems. This length is based on the Societé
Générale diagnostic. The responsible authority should conduct a more detailed
diagnostic |
3 |
15 |
230.4 |
|
1 |
10 |
|
10 |
|
100% |
Reduce water
losses |
High |
3 |
|
| Water |
|
Mount Leb. |
|
|
|
Iklim
elkharoub Project (Dahr El-Saouaneh Hill, transmission line, and TP). 24,6 km
of transmission pipes) Pumping station: Q= 292 l/s, 255 m (located at Dahr
El-Saouaneh Hill) Reservoirs (36,000 m3), the first phase: 22,000 m3,
including raw water reservoirs: 4000 m3. Treatment plant: 50,000 m3/day, the
first phase: 25,000 m3/day |
|
This project
necessitates to update the feasibility study |
2 |
5 |
32 |
5.25 |
1 |
10 |
10 |
15 |
Phase 1: 21,3 millions usd. |
50% |
This project increases the
water production 17 Mm3/year |
Low |
1 |
|
| Water |
|
Mount Leb. |
|
|
|
Works
on Barouk and Kaa springs |
This project is
proposed in the CDR list |
|
1 |
3 |
4 |
|
|
|
|
|
|
|
Increase water
supply 5000 m3/day |
|
1 |
|
| Water |
|
Mount Leb. |
|
|
|
Diagnostic of
water supply systems |
|
|
1 |
2 |
0.2 |
|
|
|
10 |
|
|
50% |
Evaluation of
water supply system |
Low |
1 |
|
| Water |
|
Mount Leb. |
|
|
|
Supply with
Potable Water of Jerd Aaley Region (Convey water to 13 villages (58,0000 hab)
by drilling and equipping 4 new boreholes in Ain Dar-Es Safa valley ) |
Does not include distribution
network |
|
1 |
2 |
6.2 |
|
1 |
10 |
10 |
15 |
|
50% |
increase
supplyto 145l/cap/d |
Low |
1 |
|
| |
|
|
Institutional Setup |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Subscriptions
number |
65,247 |
102,500 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Number of Staff |
178 |
181 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Water |
|
Mount Leb. |
Number of water meters |
0 |
102,500 |
26,000 water meters to install |
|
|
2 |
6 |
6.5 |
|
1 |
20 |
10 |
10 |
|
30% |
|
Low |
2 |
|
| |
|
|
|
|
|
52,000 water meters to install |
|
|
8 |
12 |
13 |
|
1 |
20 |
35 |
10 |
|
50% |
|
Low |
3 |
|
| |
|
|
|
|
|
24,500 water meters to install |
|
|
20 |
6 |
6.1 |
|
1 |
20 |
10 |
10 |
|
50% |
|
Low |
x |
|
| |
|
|
Management Software |
Non |
Yes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Economic values: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Investment (a) |
120 |
153 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Land value / expropriation (a') |
14 |
19 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Yearly maintenance cost (b) |
0.5% |
1% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Major rehab/replac. cost (c ) |
2% |
10% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Span for rehab/replc (d) |
15 |
40 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Yearly operation cost (e) |
2% |
12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Performance Indicators: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Results |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Actual
quantity of water demand (m3/day)(2006)/Actual quantity of exploited
resources(m3/day)(Barouk with Iklim Kharoub) |
88,250/56,680 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Actual
quantity of water demand (m3/day)(2006)/Actual quantity of exploited
resources(m3/day)(Iklim Kharoub without Barouk) |
23,000/8,300 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Future
quantity of water demand (m3/day)(horizon 2020)/Actual quantity of exploited
resources(m3/day)(Iklim Kharoub without Barouk) |
33,500/8,300 |
Equal or less than 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Future
quantity of water demand (m3/day)(horizon 2020)/Actual quantity of exploited
resources(m3/day)(Barouk with Iklim Kharoub) |
102,500/56,680 |
Equal or less than 1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Number of
supply hours/day |
ND |
24 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Quality of
water vs. international norms |
ND |
Good |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
% of network
ages more than 35 years |
70 |
0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Percentage of
unaccounted for water (%) |
29% |
20% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Means |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Number of
staff per 1000 connections |
1.97 |
2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Percentage of
water metering coverage per water authority (%) |
0 |
100% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Collection
ratio of fees (%) |
65% |
90% |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
Revenues of
water authority(Billions LL)-expenditures of water authority (Billions LL) |
2002: 6.2-4.29 |
Equal or more than 0 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
P1 |
43.6 |
|
|
|
|
P0 |
0 |
|
|
|
|
Px |
6.1 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|