Sector: Water supply Present Population Population (2020)
Sub-Sector / Technically Autonomous Unit: Saida 200,000 232,200          
Component Present Situation Target Situation Projects Characteristics Priority
      Technical Constraints Cost  Impact Uncertainty
Sector Sub-sector Geographic area   Sp St ∆S Remarks Description Min. delay to start (Year) Min. constr. Period (Year) Million US$ Land value / expro. (a') % Yearly maintenance cost (b) % Major rehab/replac. cost (c ) % Span for rehab./replc. (d) Yearly operation cost (e) % Remarks Uncertainty
      Physical Stock                                  
      Number and capacity of treatment plants El Faouar, 10000 m3/day El Faouar, 10000 m3/day                              
Water   South Leb. Number and capacity of reservoirs(m3) 3; 5225 m3 46,400 m3 Rehabilitation of the main reservoir (5000 m3)   1 3 0.15   1 10 35 10   30% Reduce leakage Low 2
Water   South Leb.       Construction of reservoirs (19,275m3)     1 4 4.8 1.6 1 10 35 10   40% Increase capacity of storage Low 3
Water   South Leb. Length of network (Transmission+Distribution)(km) ND (Transmission), 90 km (distribution) ND+10km (Transmission), 90 km (distribution) Renovation of 6.8 km of distribution line   1 3 0.95   1 10 10 10 0.75 (Transmission), and 0.18 (Distribution) 50% Reduce leakage Low 1
Water   South Leb.       Extension of the transmission line 3 km (from Kfaroué source)     1 3 0.75   1 10 10 10   50%   Low 1
Water   South Leb.       Additional 10,000 m3 of water are required   Feasibility study required 7 2 0.1       10     50%   Medium 1
Water   South Leb.       Construction of 5 km of transmission lines   5 3 1.2   1 10 10 10   50%   Medium 3
      Institutional Setup                                    
      Subscriptions number 17,000                                
      Number of Staff 40 40                              
Water   South Leb. Number of water meters 15,000 58,500 10,875 water meters to install (2000 in Maamariyé)   1 4 2.7   1 20 10 10   30%   Low 2
          21,750 water meters to install (2000 in Maamariyé)     5 8 5.4   1 20 35 10   50%   Low 3
          10,875 water meters to install (2000 in Maamariyé)   13 4 2.7   1 20 35 10   50%   Low x
      Management Software No Yes                                
      Economic values:                                    
    Investment (a) 14 23                              
    Land value / expropriation (a') 1 3                              
    Yearly maintenance cost (b) 2.3% 1%                              
    Major rehab/replac. cost (c ) 8% 10%                              
    Span for rehab/replc (d) 13 40                              
    Yearly operation cost (e) 9% 12                              
      Performance Indicators:                                    
                                         
      Results                                  
      Actual quantity of water demand (m3/day)(2006)/Actuel quantity of exploited resources(m3/day) 40,000 /39,000                                
      Future quantity of water demand (m3/day)(horizon 2020)/Actuel quantity of exploited resources(m3/day) 58,000 /39,000 Equal or less than 1                              
      Number of supply hours/day 24 24                              
      Quality of water vs. international norms Good Good                              
      % of network ages more than 35 years NA 0                              
      Percentage of unaccounted for water (%) 7% Unaccounted for water (5% leakage) 20%                              
      Means                                  
      Number of staff per 1000 connections 2 2                              
      Percentage of water metering coverage per water authority (%) 88% 100%                              
      Collection ratio of fees (%) 88% 90%                              
      Revenues of water authority(Billions LL)-expenditures of water authority (Billions LL) 2003: 3.32-2.4 Equal or more  than 0                              
                                           
P1 1.8
P0 0
Px 2.7