Sector: Water supply Present Population Population (2020)
Sub-Sector / Technically Autonomous Unit: Chamsine 165,000 191,600          
Component Present Situation Target Situation Projects Characteristics Priority
      Technical Constraints Cost  Impact Uncertainty
Sector Sub-sector Geographic area   Sp St ∆S Remarks Description Min. delay to start (Year) Min. constr. Period (Year) Million US$ Land value / expro. (a') % Yearly maintenance cost (b) % Major rehab/replac. cost (c ) % Span for rehab./replc. (d) Yearly operation cost (e) % Uncertainty
      Physical Stock                                
      Number and capacity of treatment plants 0 0                            
Water   Bekaa Number and capacity of reservoirs(m3) 61; 15,000 38,300 m3 10,650m3 reservoirs for rehabilitation (including 1200 m3 of reservoirs to rehabilitation in: Mdoukha, Khirbit Rouha, Bakka, Elbir, Rachaya, Marj Elzouhour)     1 2 0.32   1 10   10 30%   Low 2
      Length of network (Transmission+Distribution)(km) 285 km (transmission), and 141km (distribution) 300 km (transmission), and  170 km (distribution) Pumping stations on Ain Zarqa On going                        
Water   Bekaa       Construction of reservoirs (5250m3)     1 3 1.3 0.19 1 10 10 10 40%   High 3
Water   Bekaa       15 km of transmission network for construction     1 3 3.8   1 10 10 10 30%   High 1
Water   Bekaa       30 km of distribution network for construction     1 3 2.1   1 10 10 10 30%   High 1
Water   Bekaa       Diagnostic study for water supply sector     1 2 0.2       10   50%   Low 1
Water   Bekaa       Supply with potable water of Package 2 of West Bekaa Caza Loussy System (Drilling of 2 boreholes, construction of 2 regional reservoirs(2000m3 each) Construction of 2 control stations, 96Km of transmission lines and 156Km of distribution lines)     2 6 23.6 0.12 1 10 10 15     Low 3
      Institutional Setup                                  
      Subscriptions number 17,000 47,900                              
      Number of Staff 55                                
Water   Bekaa Number of water meters 0 47,900 12,000 water meters for installation     2 4 3   1 20 10 15 30%   Low 3
Water   Bekaa   24,000 water meters for installation     6 8 6   1 20 35 15 50%   Low x
Water   Bekaa   11,900 water meters for installation     14 4 3   1 20 35 15 50%   Low x
      Management Software Yes Yes                            
      Economic values:                                  
    Investment (a) 17.6 37                            
    Land value / expropriation (a') 3.8 4                            
    Yearly maintenance cost (b) 1.7% 1%                            
    Major rehab/replac. cost (c ) 13% 10%                            
    Span for rehab/replc (d) 29 40                            
    Yearly operation cost (e) 0% 12                            
      Performance Indicators:                                  
                                       
      Results                                
      Actual quantity of water demand (m3/day)/Actual quantity of exploited resources(m3/day) 33,000/33,000                              
      Future quantity of water demand (m3/day)(horizon 2020)/Actual quantity of exploited resources(m3/day) 47,900/33,000 Equal or less than 1                              
      Number of supply hours/day NA 24                              
      Quality of water vs. international norms NA Good                              
      % of network ages more than 35 years NA 0                              
      Percentage of unaccounted for water (%) 50 % UFW 20%                              
      Means                                
      Number of staff per 1000 connections 2.2 2                              
      Percentage of water metering coverage per water authority (%) 0 100%                              
      Collection ratio of fees (%) 41 % (2003) 90%                              
      Revenues of water authority(Billions LL)-expenditures of water authority (Billions LL) 2.3-2.3 Equal or more than 0                              
                                         
P1 6.1
P0 0
Px 9