WWWCDR     
       Project for supplying drinking water in the Bekaa           Signing of contract for executing the first phase of the Litani Water Project          Work meeting with the Turkish delegation          Work meeting with a delegation from the Italian Embassy          Work meeting with the Head of Tabarja municipality          Work meeting with the deputy Ms. Gilberte Zwein.          Work meeting at CDR          Work meeting with MP Mr. Kazem Al-Kheir      
 

 

Latest Ongoing Projects

 

 

 

 

 


 

 


18/01/2012 Project for supplying drinking water in the Bekaa
17/01/2012 Signing of contract for executing the first phase of the Litani Water Project
16/01/2012 Work meeting with the Turkish delegation
13/01/2012 Work meeting with a delegation from the Italian Embassy
13/01/2012 Work meeting with the Head of Tabarja municipality
12/01/2012 Work meeting with the deputy Ms. Gilberte Zwein.
12/01/2012 Work meeting at CDR
11/01/2012 Work meeting with MP Mr. Kazem Al-Kheir
10/01/2012 Work meeting with MP Dr. Waleed Sukkarieh
10/01/2012 Work meeting with MP Mr. Samir El-Jisr
09/01/2012 Work meeting at the Grand Saray
05/01/2012 Work meeting with The Minister of Education and Higher Education
1  2  3  4  5  6  7