Project name: Urban Transport Development Project
Corridor Improvement Program
Daoura Viaduct
Funding : International Bank for Reconstruction and Development (70%)

Lebanese Governement (30%)
Consultant:  Dar Al Handasah Nazzih Taleb & Partners - DAHNT

Mott MacDonald Limited - MML (JV)
Contractor: Nicolas Srouji Establishment for Contracting
Description:
 
The project is part of the Corridor Improvement Project and covers the Daoura roundabout by replacing the existing one-way steel bridge with a 2 way permanent carriageway viaduct of 3 x 3.50m in each direction and will allow the grade movements to operate as a roundabout

The work comprise mainly of constructing two permanent pre-stressed post tension concrete bridges carrying traffic over the Daoura Roundabout connecting Eastbound and Westbound traffic respectively over the Daoura Roundabout. The overall length of the bridge is approximately 375m with 10 spans. The length of the bridge with the addition of the ramps at both sides is approximately 505m. Abutments and piers are in reinforced concrete.

The works also include upgrading the existing service roads and roadway networks, with relocation of an existing main water supply line of Φ1000mm diameter along a length of 900m.
 
Progress: 100%

The bridge was opened to traffic in all directions around August 10, 2008. The work completed by December 2008.