WWWCDR     
       Project for supplying drinking water in the Bekaa           Signing of contract for executing the first phase of the Litani Water Project          Work meeting with the Turkish delegation          Work meeting with a delegation from the Italian Embassy          Work meeting with the Head of Tabarja municipality          Work meeting with the deputy Ms. Gilberte Zwein.          Work meeting at CDR          Work meeting with MP Mr. Kazem Al-Kheir      
 

 

Latest Ongoing Projects

 

 

 

 

 


 

 
 
 

Progress Report October 2009

- Message from the President (PDF 62 KB)
- Introduction (PDF 168 KB)
 

- Main Sectors Development
       
Physical Infrastructure
           - Electricity
(PDF 346 KB)
           - Post and Telecommunications
(PDF 184
KB)
           - Urban Transportation
(PDF 793 KB)

       
Social Infrastructure
          - Education
(PDF 1.40 MB)
          - Public health
(PDF 303 KB)
          - Social and Economic development
(PDF 1 MB)
          - Land Use and Environment
(PDF 640 KB)

     

        Basic services

          - Potable Water Supply (PDF 540 KB)
          - Waste Water (PDF 546 KB)
          - Solid Waste (PDF 180 KB)
 

        Productive sectors and other sectors
          - Agriculture and irrigation (PDF 227 KB)
          - Sovereign Services (PDF 276
KB)
   

 

- Financing the Reconstruction (PDF 372 KB)